Plumbing Permits

Before any plumbing work is done or any additions are made to old work, excepting necessary repairs, a plumbing permit must be obtained from the Public Works. Plumbing permits will be issued only to New Hampshire Licensed Master Plumbers. A current plumbing license must be displayed each time a permit is issued. 

Self-Plumbing

Homeowners desiring to do their own plumbing work must obtain approval from the Director and/or the Plumbing Inspector. Homeowners must have the skills required for this work.

Plumbing Inspections

  • All plumbing must be inspected by Public Works. New construction requires 2 inspections:
    • The "slab" or "underground" inspection
    • The "rough-in" inspection prior to installation of sheet rock/wallboard.
  • Remodeling work will be inspected one time.
  • The plumber must be present for all inspections.
  • The Plumbing Inspector can be reached at 603-528-637.
  • Plumbing inspections need to be scheduled 24 hours in advance.
  • No plumbing inspections are scheduled on Fridays.
  • Modular homes will be subject to traditional air/water tests by the DPW plumbing inspector.

Resource

Sample Plumbing Permit