2021 Road Program
The Department of Public Works has paved the following streets this spring – Weirs Boulevard (roundabout to NASWA), Lakeside Avenue (Foster Ave to Centenary Ave), Shore Drive (Pump Station Road to 422 Shore Drive). Streets scheduled for overlay paving this summer/fall include – Lyford St, McGrath St, Belknap St (Lyford St to Oak St), Round Bay Rd, and Dyer St.. Franklin Street, from Washington Street to Fairmont Street, is scheduled for water, drain, road and sidewalk reconstruction. Check back for updates or contact Krista Larsen, Assistant Public Works Director, at 528-6379 or KLarsen@laconianh.gov with any questions.